Agenda for Meeting of March
26, 2007
1. Call meeting to order.
2. Give pledge to the flag.
3. Give Open Public Meetings Act Statement
Adequate notice pursuant to the Open Public Meetings
Act has been given of
this meeting by:
a. Forwarding notice thereof to Todays
Sunbeam and the Daily Journal, both of which were printed in the January 10,
2007 editions.
b. Posting notice thereof on the community
events bulletin board at the
c. Filing notice thereof in the Office of the
Municipal Clerk.
(All
of the above was done at least 48 hours in advance.)
4. Attendance Members and attendees
sign-in and voters designated.
5. Approval of minutes of the February
26, 2007 meeting.
6.
Unfinished Business
Redevelopment
status (Bob)
Ordinances
Wellhead Protection and T & E - (Bob and Dave)
EIS
recommendations to the Planning Board (Bob)
Conservation
Design To be discussed at joint PB/EC meeting
Subdivision
applications
Open
Space
Farmland PIG Status
Schroeder
Completing Title work. Closing expected in early
April
Tamagni Awaiting Survey Report
Kibort Reappraisal to be conducted
Petronglo Filling out application
Olbrich Meeting March 24
Green
Acres and other Open Space
Renwick
Reappraisal to be done
Briar
Hill no action currently
Running
Deer Asking SCIA to make initial purchase
Danna Property working with GA for
reappraisal
7. Report on area meetings/training:
March
17 Gardening for Wildlife
Other
8. New Business:
Cluster
Ordinance Issues
The
Township Ordinance Review Committee is still to meet.
A letter to PB and Twp. Engineer has been drafted to
reiterate the exclusion of wetlands, wetland transition areas,
farmland buffers, drainage basins and other stormwater
facilities from being used in the calculation of lot yield, from
occupying any portion of lots created in a clustered subdivision. The Ordinance Review Subcommittee has been
asked to review inconsistencies in the requirement for farmland buffers.
The
Township is taking steps to obtain an up-to-date build-out analysis.
Conservation
Design Arrangements are being made for a panel discussion on the protection
of Flora and Fauna for the PB and EC,
to
be followed up, probably at a subsequent meeting, by an up-date and discussion
on the conservation design efforts.
Other
9. Upcoming events/meetings/training:
March
31st SJ Vernal Pool Project
Other
10. Issues before the Planning Board
11.
Communications
12.
Member Comments
13.
Public Comments
14. Adjournment